← All Technology Park technologies
CowpeaImproved varieties
Ghana’s first genetically modified cowpea: built-in protection against the Maruca pod borer, early maturity (60–65 days) and potential yield of 2.5 t/ha.
Key traits
| Year released | 2024 |
| Yield Potential | 2.5 t/ha |
| Maturity Period | Early: 60–65 days |
| Maruca Resistance | Resistant to Maruca Pod Borer |
| Spray Requirement | Only 2 sprays (Bud & Flower) |
Suited to: Guinea Savanna, Sudan Savanna, Transitional Forest-Savanna
Planted in the park: 06/08/2026
Production guide
- Land Preparation (May – June (Before onset of steady rains)). Plough and harrow thoroughly to achieve a fine, weed-free seedbed. Avoid waterlogged depressions; cowpea prefers well-drained sandy-loam savanna soils.
Clear deep-rooted perennial shrubs; Plough to 15-20cm depth; Harrow within 24 hours of ploughing to retain moisture.
Caution: Do not plant in fields prone to standing water or severe waterlogging. - Seed Treatment & Inoculation (At planting day). Treat certified Songotra-T seed with Apron Star or SARI-approved seed dressing fungicide. Inoculate with SARI Biofix Rhizobium for optimum nitrogen fixation.
Use only CSIR-SARI certified blue-tag seed; Mix 1 sachet (100g) inoculant with 10kg seed using gum arabic sticker in shade; Dry in shade for 20 mins before planting. - Planting & Spacing (Planting Date: 06/08/2026 (Savanna window)). Plant at exact SARI recommended spacing of 60cm between rows and 20cm between hills along the row. Drop 2 seeds per hill and thin to 1 vigorous seedling per hill at 10 days.
Row spacing: 60 cm; Plant-to-plant: 20 cm; Planting depth: 3 – 4 cm (ensure soil contact); Seeding rate: 20 – 25 kg/ha (8 – 10 kg/acre). - Fertilizer & Soil Fertility (10 – 14 Days After Planting (DAP)). Songotra-T fixes its own nitrogen if inoculated. Apply phosphorus-rich basal fertilizer such as Triple Superphosphate (TSP) or 0-20-20 at 30kg P2O5/ha.
Apply TSP at 1 bag (50kg) per hectare band placed 5cm away from plant line; Do NOT apply excessive Urea or nitrogen fertilizer as it causes vegetative foliage overgrowth. - Integrated Pest Management (IPM) (Budding stage (35 DAP) & Podding stage (48 DAP)). Because Songotra-T is resistant to Maruca, you only need 2 sprays to control secondary sucking bugs (Clavigralla, thrips, aphids).
Spray 1: At flower bud initiation (30-35 DAP) using approved synthetic pyrethroid/neem extract; Spray 2: At 50% podding (48-52 DAP) for pod-sucking bugs; Scout field twice weekly early morning.
Caution: Spray in early mornings (6:00 – 8:30 AM) or late afternoon to avoid killing beneficial honeybees. - Harvesting (60 – 65 Days After Planting). Harvest as soon as 85-90% of pods turn straw-yellow / brown. Hand-pick dry pods or cut whole plants in early morning to prevent pod shattering.
Pick in 2 passes to collect early-matured pods; Dry pods immediately on clean tarpaulin for 2-3 sunny days until moisture is below 12%. - Threshing & Hermetic Storage (Postharvest). Thresh using SARI Multi-Crop Motorized Thresher or beat gently in sacks. Store clean grain in PICS (Purdue Improved Crop Storage) triple-layer hermetic bags without synthetic chemicals.
Ensure grain moisture is below 11% (grain cracks crisply between teeth); Pack tightly in PICS bags and seal inner two liners separately; Keep sacks on wooden pallets in well-ventilated dry store.
Find it in the park
- Plot
- Plot D-01 – Legume Improvement & Biotech Demonstration Field
- Location
- Immediately West of the Main Demonstration Pavillion & Rain Gauge Station
- Signboard code
- SARI-TP-CP-01
Lead scientistDr. Jerry A. NboyineHead of Plant Protection
