← All Technology Park technologies
GroundnutImproved varieties
Potential yield 2.7 t/ha, maturity 100-105 days, dual purpose, drought tolerant groundnut with leaf spot tolerance.
Key traits
| Potential Yield | 2.7 t/ha |
| Maturity Period | 100-105 days |
| Disease Tolerance | Tolerant to Leaf Spot Diseases |
| Crop Purpose | Dual Purpose |
| Drought Resilience | Drought Tolerant |
| Oil Yield | Excellent Source of Oil |
Suited to: Guinea Savanna, Sudan Savanna, Forest-Savanna Transition
Planted in the park: 22/06/2026
Production guide
- Land Preparation (May – Early June). Tractor or bullock plough to a depth of 15-20cm. Form ridges 60cm apart to improve drainage and enhance peg penetration.
Clear old crop stubble to eliminate fungal spores; Apply phosphorus fertilizer (SSP) at land preparation. - Planting & Density (Planting Date: 22/06/2026). Plant on 22/06/2026 with certified seed. Space 60cm between rows and 15-20cm between hills with 1 seed per hill at 4-5cm depth.
Seed rate: 25-30 kg/ha; Use clean, fungicide-treated certified seed. - Weed Control & Hilling (3 – 5 Weeks After Planting). Carry out early manual weeding. Lightly ridge up soil around plant base before flowering to encourage easy peg entry into soil.
Avoid root and peg disturbance during flowering; Maintain clean field perimeter. - Harvesting & Curing (100 – 105 Days After Planting). Harvest when 75-80% of pods show internal brown coloration. Lift plants, invert under the sun to dry, and preserve haulms for animal feed.
Cure pods for 4-6 days on tarpaulins; Store in dry hermetic bags.
Find it in the park
- Plot
- Plot D-20B – Dual-Purpose Groundnut Demonstration Unit – SARINUT 4
- Location
- Central Legume Field block, adjacent to Plot D-20
- Signboard code
- SARI-TP-GN-12
Lead scientistDr. Richard Oteng-FrimpongGroundnut Breeder
